ferent color from that used in drawing those for which the applicant asks right of way.

8. Field notes of the surveys must be filed in duplicate, giving, in addition to the ordinary records of surveys, the data called for in this and in the following paragraphs. They should state which line of the canal was run, whether middle or side line. The stations or courses should be numbered in the field notes and on the map. The record should be so complete that from it, the surveys could be accurately retraced by a competent surveyor with proper instruments. The field notes should show whether the lines were run on the true or the magnetic bearings; and, in the latter case, the variation of the needle and date of determination must be stated. The kind and size of the instrument used in running the lines, and its minimum reading on the horizontal circle should be noted. The line of survey should be that of the actual location of the proposed ditch, and as exactly as possible, the water line of the proposed reservoir. The method of running the grade lines of canals, and the water lines of reservoirs must be described.

9. The scale of the map should be 2,000 feet to an inch in the case of canals or ditches and 1,000 feet to an inch in the case of reservoirs. The maps may, however, be drawn to a larger scale, when needed to properly show the proposed works; but the scale must not be so greatly increased as to make the map inconveniently large for handling.

10. All subdivisions of the public surveys represented on the map should have their entire boundaries drawn, and on all lands affected by the right of way, must be shown the smallest legal subdivisions (40-acre tracts and lots).

11. The applicant should mark each of the subdivisions affected by the right of way "V" or "vacant" if it belongs to the public domain at the time of filing the map in the local land office, and the same must be verified by the certificate of the register. If it does not affirmatively appear that some portion of the public land is affected the local officers will refuse to receive the maps.

12. The termini of a canal, ditch, or lateral should be fixed by refer ence to the nearest existing corner of the public survey. The initial point of the survey of a reservoir should be fixed by reference to the nearest existing corner outside the reservoir, by a line which does not cross an area that will be covered with water when the reservoir is in use. The map, field notes, engineer's affidavit, and applicant's certificate (Forms 3 and 4) should each show these connections.

13. When either terminal of a canal, ditch, or lateral is upon unsurveyed land it must be connected by traverse with an established corner of the public survey, if not more than 6 miles distant from it, and the single bearing and distance from the terminal point to the corner, computed, and noted on the map, in the engineer's affidavit, and in the applicant's certificate (Forms 3 and 4). The notes and all data for the computation of the traverse must be given in the field notes.

14. When the distance to an established corner of the public survey is more than 6 miles, this connection will be made with a natural object or a permanent monument which can be readily found and recognized, and which will fix and perpetuate the position of the terminal point. The map must show the position of such marks, and course and distance to the terminus. The field notes must give an accurate description of the mark and full data of the traverse as required above. The engineer's affidavit and applicant's certificate (Forms 3 and 4) must state the connections. These monuments are of great importance.

15. When a canal, ditch, or laterial lies partly on unsurveyed land, each portion lying within surveyed and unsurveyed land will be separately stated in the field notes, and in Forms 3 and 4, by connections of termini, length and width as though each portion were independent. (See paragraphs 12, 13, and 14.)

16. When a reservoir lies partly on unsurveyed land, its initial point must be noted, as required for the termini of ditches in paragraph 12, and so that the reference line will not cross an area that will be covered with water when the reservoir is in use. The areas of the several parts lying on surveyed and unsurveyed land must be separately noted on the map, in the field notes, and in Forms 3 and 4.

17. Maps showing canals, ditches, or reservoirs wholly upon unsurveyed lands may be received and placed on file in the General Land Office and the local land office of the district in which the same occurs, for general information, and the date of filing will be noted thereon; but the same will not be submitted to nor approved by the Secretary of the Interior, as the act makes no provision for the approval of any but maps showing the location in connection with the public surveys. The filing of such maps will not dispense with the filing of maps after the survey of the lands and within the time limited in the act granting the right of way, which map, if in all respects regular when filed, will receive the Secretary's approval.

18. In filing such maps the initial and terminal points will be fixed, as indicated in paragraphs 13 and 14.

19. Whenever the line of survey crosses a township or section line of the public survey, the distance to the nearest existing corner should be ascertained and noted. In the case of a reservoir the distance must not be measured across an area which will be covered with water when the reservoir is in use; and permanent monuments must be set on the water line of the reservoir at the intersection of these lines of public survey. The map of the canal, ditch, or reservoir must show these distances and marks, and the field notes must give the points of intersection and the distances, and describe the marks. When corners are destroyed by the canal or reservoir proceed as directed in paragraphs 22 and 23.

20. The map must bear a statement of the width of each canal, ditch, or lateral at high water line; if not of uniform width, the limits of the

deviations from it must be clearly defined on the map; the field notes should record the changes in such a manner as to admit of exact location on the ground. The map must show the source of water supply.

21. In applications for right of way for a reservoir, the capacity of the reservoir must be stated on the map in acre-feet (i. e., the number of acres that will be covered one foot in depth by the water it will hold; one acre-foot is 43,560 cubic feet). The map must show the source of water supply for the reservoir and the height of the dam.

22. Whenever a corner of the public survey will be covered by earth or water, or otherwise rendered useless, marked monuments (one on each side of destroyed corner) must be set on each township or section line passing through, or one on each line terminating at, said corner. These monuments must comply with the requirements for witness. corners of the Manual of Surveying Instructions issued by this office (p. 31, ed. 1890), and must be at such distance from the works as to be safe from interference during the construction and operation of the same. In the case of reservoirs these monuments are additional to those required in paragraph 19. In case two or more consecutive corners on the same line are destroyed, the monument shall be set as required in the manual for the nearest corner on that line to be covered. 23. The line on which such monument is set will be determined by running a random line from the corner to be destroyed to the first existing corner on the line to be marked by the monument, setting on the random line a temporary mark at the distance of the proposed monument; if the random line strikes the corner run to, the monument will be established at the place marked; if the random line passes to one side of the corner, the north and south or east and west distance to it will be measured and the true course calculated, the proper correction of the temporary mark will then be computed, and a permanent monument set in the proper place. The field notes for the surveys establishing the monuments must be in duplicate, and separate from those of the canal or reservoir, being certified by the surveyor under oath. They must comply with the form for field notes prescribed in the Manual of Surveying Instructions issued by this office. When application is made for a canal or reservoir which is constructed and in operation, the method to be adopted in setting the monuments, being governed by the special features of each case, must be left to the judgment of the surveyor. No field notes will be accepted unless the lines on which the monuments are set conform to the lines shown by the field notes of the survey as made originally under the direction of this office, and unless the notes are in such form that the computation can be verified and the lines retraced on the ground.

24. The engineer's affidavit and applicant's certificate must both designate by termini (as in paragraphs 12 to 18 inclusive) and length each canal, ditch, or lateral, and by initial point and area each reservoir, shown on the map, for which right of way is asked. This affida

vit and this certificate (changed where necessary when an application is made by an individual or association of individuals) must be written on the map and duplicate. (See Forms 3 and 4, pp. 15, 16.) No changes are allowable in the substance of these forms, except when the facts differ from those, assumed in the forms.

25. When the maps are filed the local officers will note in pencil on the tract books opposite each tract traversed that right of way for a canal (or reservoir) is pending, giving date of filing and name of applicant, noting on each map the date of filing, transmitting them promptly to the General Land Office. (See paragraph 11.)

26. Upon approval of a map of location by the Secretary of the Inte rior, the duplicate copy will be sent to the local officers, who will mark upon the township plats the lines of the canals, ditches, or reservoirs as laid down on the map. They will also note, in pencil, on the tract books, opposite each tract of public land, that the same is to be disposed of subject to the right of way for the canal, ditch, or reservoir. Thereafter, in disposing of such lands, the claim to which shall have been initiated subsequent to the date of approval of the map, the register and receiver will note, in red ink, across the face of the certificate issued upon any entry made, that the same is allowed subject to the right of way of the canal, ditch, or reservoir, giving its name, and refer to the letter from this office transmitting the map, by its initial and date.

27. When the canal, ditch, or reservoir is constructed, an affidavit of the engineer and certificate of the applicant (Forms 5 and 6) must be filed in the local office, in duplicate, for transmission to this office. In case of deviations from the map previously approved, there must be filed new maps and field notes in full, as herein provided, bearing Forms 5 and 6, changed to agree with the facts of the case.

28. The duty of this office in examining the maps and papers of these applications, is to ascertain whether the provisions of the act of Congress are properly complied with; whether the proposed works are described in such a manner that the benefits to be granted by the approval of the Secretary of the Interior are defined so as to avoid future uncertainty, and whether the rights of other grantees of the Government are properly protected from interference. The above regulations are made for these purposes.

29. The widely different conditions to be considered in the operations proposed by the applicants make it impossible to formulate regulations that will furnish this office with the data necessary in all cases. This office will, therefore, call for additional information whenever necessary for the proper consideration of any particular case. S. W. LAMOREUX,

Approved February 20, 1894.

Commissioner.

HOKE SMITH,

Secretary.

[ocr errors]

FORMS FOR "DUE PROOFS" AND VERIFICATION OF MAPS OF RIGHT OF WAY FOR CANALS, DITCHES, AND RESERVOIRS.

I,

FORM 1.

, secretary (or president) of the

com

pany, do hereby certify that the organization of said company has been completed; that the company is fully authorized to proceed with construction according to the existing laws of the State (or Territory); and that the copy of the articles of association (or incorporation) of the company filed in the Department of the Interior is a true and correct copy of the same.

In witness whereof, I have hereunto set my name and the corporate seal of the company.

[SEAL.]

State of......
County of

of the

Company.

9

FORM 2.

being duly sworn, says that he is the president of the Company, and that the following is a true list of the officers of the said company, with the full name and official designation of each, to wit: (Here insert the full name and official designation of each officer.)

[blocks in formation]
[ocr errors]

being duly sworn, says he is the chief engineer of (or

is the person employed to make the survey by) the

pany; that the survey of said company's (canals, ditches, and reser

Com